Mitigation · Performance monitoring · Bonds
When a project affects a wetland, a stream or a buffer, the permit comes with two obligations that outlast construction. Mitigation replaces the functions the project removes, usually by planting native trees and shrubs. Performance monitoring measures those plantings against the standards in the approved plan, typically for five years, until the jurisdiction signs off and releases the last of the bond. This page sets out the steps, the timeline, the costs and who pays whom.
Two terms, one obligation
Mitigation is the code's term for dealing with a project's impact on a critical area. Critical areas codes set an order of priority for it. In short:
On a residential lot, compensation usually means clearing invasive plants from part of the buffer and replanting it with native trees and shrubs, often with a split-rail fence and critical area signs. Where the lot cannot hold all of it, some jurisdictions allow the remainder to be offset with in-lieu fee or mitigation bank credits; the program, not the owner, then builds and monitors that share.
Performance monitoring is the scheduled series of site visits and reports that shows the jurisdiction the mitigation is doing what the approved plan said it would. Each visit measures the planted area against written performance standards: how many plants survived, how much native cover has grown in, and how much of the area invasive plants occupy.
Most jurisdictions make it part of every mitigation plan: a monitoring schedule, typically five years, with performance standards for each monitoring year, a maintenance plan and a contingency plan in case the plantings fall short.
The obligation ends when the final monitoring report is approved, not when the plants go in.
Most jurisdictions require the mitigation plan to be prepared and signed by a qualified professional.
Our plans are signed by a Professional Wetland Scientist (PWS). Meet our team.
What this means for you
Budget for three things beyond the report: the installation, the monitoring years, and a bond, part of which stays with the jurisdiction until final sign-off. All three are set by the approved mitigation plan, so the plan is where the cost is decided. A plan with a right-sized mitigation area and standards the plant schedule can meet costs less to install, less to monitor and less to bond.
Requirements vary by jurisdiction. Your permit conditions and approved mitigation plan state what applies to your project. For examples of the code behind this page, see King County Code 21A.24.114, 21A.24.125 and 21A.24.130 and Snohomish County Code 30.62A.150 and 30.62A.310.
From mitigation plan to released bond
Four parties carry the work: you, your landscape contractor, your environmental consultant and the jurisdiction. The sequence below is the general one for a project with onsite planting.
What this means for you
The spring review is the short visit that protects the fall one. A site that reaches its fall visit with dead plants or blackberry regrowth misses its standard for the year, and a missed standard keeps the remaining bond in place and can add monitoring years. A punch list in April gives the whole growing season to fix it.
Thirty seconds
Plant count is the largest driver of the installation price. Enter the mitigation area from your plan, or a rough figure, and the tool applies typical planting densities for buffer enhancement.
Trees about 9 feet on center and shrubs about 6 feet on center (0.012 and 0.028 per square foot). Where the plan requires groundcover, about 2 feet on center (0.25 per square foot). Densities vary by jurisdiction and with the vegetation already on the site, and the approved planting plan sets the final count. These figures are the minimums in King County's February 2026 guidance.
Trees and shrubs
Know the numbers up front
Four parties are paid over the life of a mitigation project, and only one of them is us. This section separates our fee from the contractor's price, the jurisdiction's charges and the bond.
We bill monitoring at $200 per hour against actual hours, so a site that takes less time costs less. The total depends on:
| What the fee covers | When |
|---|---|
| Pre-installation meeting | Before planting |
| Baseline site assessment, Baseline Assessment Report and as-built planting plan | Within 30 days of planting |
| Maintenance review and memo | Each spring |
| Performance monitoring and report to the jurisdiction | Each fall |
| Final report and request for sign-off | After the last fall visit |
Your proposal lists the hours and the fee for each of these, year by year, so the cost of the whole monitoring period is known before you sign. For delineation and report fees, see our cost guide.
| Paid to your landscape contractor | Estimate |
|---|---|
| 39 native trees (2-gallon) and 90 native shrubs (1-gallon) | $1,395 |
| Labor: blackberry removal, site preparation and planting, 80 hours at $85 | $6,800 |
| Split-rail fence, 150 linear feet installed | $3,750 |
| Installation estimate | $11,945 |
A 2026 planning-level estimate for a buffer enhancement area of about 3,200 square feet overrun with Himalayan blackberry. Bids for work of this size are expected between about $7,800 and $16,300. Not included: sales tax, mulch or soil amendment, temporary irrigation, critical area signs, and maintenance after installation. The contractor's bid sets the price. We do not install mitigation.
Most jurisdictions bill the permit holder for their own inspections and for administering the bond. Two examples:
| Jurisdiction | Charge | Rate |
|---|---|---|
| King County | Site condition inspection or development monitoring, single-family permit | $726 per trip |
| Snohomish County | Monitoring, inspection and administration of the performance security for mitigation planting | $96 per hour |
Sources: King County 2026 Fee Guide 02, Single Family Residential Construction; Snohomish County Code 30.86.525. Each jurisdiction publishes its own fee schedule and decides how many inspections a project needs.
Financial guarantees
A mitigation bond is security, not a fee. It gives the jurisdiction the money to finish or repair the mitigation if the permit holder does not. Jurisdictions call it by different names: bond, financial guarantee, performance security or security device. It is released in stages: a portion once the installation is confirmed, and the rest at final sign-off.
Assignment of funds. Your own money, set aside in an account at a bank or credit union and pledged to the jurisdiction. It is released back to you.
Surety bond. A surety company guarantees the amount. You pay the surety a premium; the premium is the cost of the bond and is not returned.
Cash deposit or letter of credit. Some jurisdictions accept these as well. The jurisdiction does not issue any of them; you obtain the guarantee and file it on the jurisdiction's forms.
Most jurisdictions set the bond from the estimated cost of the mitigation in the approved plan: plants, installation labor, fencing and signs, and usually the maintenance and monitoring years, plus a contingency.
The estimate is prepared on the jurisdiction's own worksheet or as a percentage above the cost of the work. It is based on what it would cost the jurisdiction to complete the project, not on your contractor's bid.
In two stages in most jurisdictions. Once the baseline report confirms the installation, the jurisdiction releases a portion of the bond. King County, for example, releases 70 percent at that point.
The remainder is released at final sign-off, after the final monitoring report shows the performance standards have been met.
What this means for you
Plan for the bond as money that is tied up, not money that is spent. A portion of it comes back once the installation is confirmed, and the rest stays with the jurisdiction until final sign-off. If you expect to sell before monitoring ends, raise it with us at the start: the guarantee and the monitoring contract both need to pass to the buyer, and that is far easier to write into a sale than to untangle after closing.
Each jurisdiction sets the amount of its guarantee and decides when it is released. For examples of the code, see King County Code Title 27A and Snohomish County Code chapter 30.84.
What gets measured
Performance standards are the pass marks written into the approved plan. Each fall visit measures the site against the marks for that year, and the monitoring report shows each result next to its standard.
Survival of planted trees and shrubs, or equivalent replacement by native plants
Invasive plants stay below 10 percent cover in the planted area at every monitoring visit.
Plans often add standards for native tree and shrub cover and for bare ground. The figures shown are from King County's February 2026 guidance and are typical of residential plans. The standards in your approved plan are the ones your site is measured against.
The report gives the jurisdiction a site map with the monitoring points, the data, the photographs, a pass or fail against each standard, and the maintenance or contingency actions that follow from the results.
A missed standard is corrected, then re-measured. When monitoring shows the mitigation is failing, most jurisdictions require a contingency plan, such as replanting, soil amendment, irrigation or more invasive removal, and can extend the monitoring period until the standards are met.
Each added year carries another year of monitoring cost, and the remaining bond stays with the jurisdiction until the standards are met.
Projects that fill or alter the wetland itself usually need state and federal approval as well. The federal mitigation rule sets a monitoring period of not less than five years (33 CFR 332.6), and the Department of Ecology states that monitoring of compensatory wetland mitigation is in general required for 10 years, with reports in set years such as 1, 2, 3, 5, 7 and 10.
A buffer planting on a residential lot is a local requirement and follows the local jurisdiction's period.
Why owners hand us their monitoring
Mitigation plans and monitoring reports signed by a Professional Wetland Scientist.
We monitor mitigation plans we wrote and plans written by other firms. Send the approved plan and we take it from there.
A monitoring proposal within one business day of receiving your approved plan and permit conditions.
Your part
Our part
Questions we hear every week
Go straight to the source
Examples from King County and Snohomish County, plus state guidance. Your own jurisdiction's code and fee schedule apply to your project.
Process steps, planting densities, performance standards and monitoring methods for residential projects.
Complex wetland and stream mitigation, maintenance and performance guarantees.
Accepted forms, reductions, release and default.
Financial guarantees, including KCC 27A.40.080 for critical areas.
Mitigation plan requirements.
Security devices, including SCC 30.84.140 for critical area mitigation.
The County's forms and bond types.
State and federal monitoring periods and report contents.
Where mitigation plans start for lots covered by buffers.
Critical area studies, mitigation plans and the CASP.
Critical Areas Designation, the first step on most septic and well lots.
Delineations, critical areas reports and code enforcement resolution.
Typical price ranges for delineations, studies and mitigation plans.
General questions about delineations, reports and permitting.
Next step
Send us the parcel and, if you have them, the approved mitigation plan and permit conditions. A real person replies within one business day with a scope and a fee for every year of your monitoring period. Sign it, and the jurisdiction's calendar is ours: the pre-installation meeting, the baseline report, each spring review, each fall report, and the request for final sign-off and release of the bond.
Prefer to talk it through? Call (425) 864-6025.
Just left us a star review
I used Eastside Environmental for a Critial Area Report. The provided a quote very quickly, the price was reasonable, and the work was completed well ahead of schedule.
It's been great working with Eastside. They are very detailed oriented, and have been a huge help getting our project under way. Easy communication, and very timely with their deliverables.
Working with Eastside Environmental Pros has been an absolute lifesaver during the wetlands study and permitting process for my property in Blaine, WA. The permitting requirements with Whatcom County can be incredibly frustrating, and the entire process ended up taking multiple years—but Eastside Environmental Pros stuck with me every step of the way and continued to be a steady, reliable source of support. They not only completed a thorough review and write-up of my environmental studies, but they also took the time to communicate clearly, answer every question, and tailor the report to meet the needs of both the county and myself. Their attention to detail and willingness to explain each step truly set them apart. On multiple occasions, Ashley Moyer and Kellen guided me through what to expect and helped clarify the often-scary process of dealing with wetlands on my property. One standout moment was when Kellen led a meeting with Whatcom County, cutting through the red tape and helping push through a permitting stalemate that had been holding everything up. I couldn’t have asked for a better team to work with. They were timely, realistic, supportive, and consistently advocated on my behalf. I highly recommend Eastside Environmental Pros to anyone needing environmental studies or help navigating permitting—they are exceptional.
I've worked with Kellen personally on many projects in my roll as a septic designer with shared clients. His team is very good to work with and very detail oriented. Excellent communication which is a rare trait and much appreciated! If you are in need of their services I highly recommend contacting them and discussing your project!
We needed support for a permit, and the team at Eastside Environmental Pros was truly on our side. They helped us think through the challenge, prepared a thorough report, provided a sign-off letter, and made the permitting process far less stressful.
Eastside Environmental Pros did a critical areas report for us on our undeveloped forest land. The process was exceptionally smooth, professional in all dealings, and the final report was of an extremely high quality. We used this report to facilitate both the creation of a forestry management plan as well as the county permitting process. I highly recommend them for ecological work here in western WA.
Wonderful experience! Quick and friendly response! Professional, timely and excellent work.
Kellen Maloney arrived at my home as scheduled, was very easy to work with and professional. I walked the property with him and he thoroughly eplained everything he was doing. He submitted his report to me in about one week as he promised. the report will be used to help me with the King County Permitting process.
Kellen and Rebecca were a pleasure to work with! Very responsive and knowledgeable. They assisted me from the beginning of the construction process while I was looking for lots by compiling a detailed wetland report that allowed me to make an informed decision on whether to proceed with the purchase. On top of that, with their knowledge of the local building guidelines they were able to double the buildable area on my lot! Additionally, when I received a request from the building department to provide additional documentation, Rebecca assisted with the required forms at no additional cost. Can't say enough good things about Eastside Environmental Pros!
Very easy to work with, created documentation for buffer averaging a tricky lot in a couple of weeks at a competitive price.
Kellen and his team are wonderful. It was a pleasure working with them. We had so much to learn, we were expertly guided through decision making every step of the way. This allowed us to make informed decisions for our project, and to honor our personal values. The team responded quickly to our many questions, and completed the documentation in a timely fashion.
We worked with Eastside on a small engagement. They are super professional and always gave the right advice w/o even worrying about their revenue. Eastside looked at our parcel and previous wetland report and gave us good pointers to move ahead with permitting process. They didn’t charge us a dime and supported the thoroughness of previous report. We would definitely use them for our future projects.
Kellen at Eastside Environmental Pros was wonderful to work with. He knew exactly what we needed to move forward with our King County building permit process and delivered the report as promised. We would highly recommend him and his team!
P\Reasonably priced and professional across the board; from our initial call, subsequent emails and site visit. I sought out a few quotes for residential permitting (a home addition), and Eastside Environmental Pros really stood out in listening to my needs/concerns and offering realistic and reasonable expectations.
Kellen at Eastside Environmental Pros is a GREAT person to work with. Responsive, knowledgeable, timely, and an active listener. We're building a tiny cabin on a tiny lot in a tough location, and he is paying attention to all of the unique and challenging details.
I had a very good experience with them. I engaged them to reevaluate wetland buffers for my parcel as previous evaluation came in at 225ft buffer. Kellen from Eastside did a new study and came in at 110ft buffer which opened up a lot of buildable space on my land. Their study also got credibility with king county when they approved the new buffer. I am glad that I engaged them and truly recommend their expertise in doing wetland studies.
Kellen and his team went above and beyond for us. They came out to the sight within two days of contacting them. They also corresponded with the city to verify a few key details that saved us potential time and headaches down the road. Definitely recommend their services!
I reached out to Eastside Environmental Pros in September for help with a critical area/wetland delineation assessment. Kellen and his team were very professional, efficient and very communicative. Pricing was straight forward and the report detailed and thorough. They were a pleasure to work with. Highly, highly recommend.
Responsive, attentive, communicative, efficient. I would not hesitate to call them again.
I reached out to Eastside Environmental Pros for a Critical Area Designation Assessment. Kellen was incredibly responsive and communicative, and the work was turned around quickly. A pleasure to work with, highly recommend.
Eastside Environmental is great to work with and I'm definitely looking to do business again in the future. Kellen is great to work with and his co-workers/assistances are very professional as well. Very honest and follows up on services performed. As a homeowner it can hard trying to decide which company to conduct business with in this type of field. As some won't return calls or perform subpar services. I didn't get that from Eastside, instead I received nothing but outstanding service from Eastside. And also no inflated prices after the services were performed. At this present day in time it seems challenging to find honest services and I feel that Eastside delivers highly in that area. Keep up the great work Eastside. Federal Way, WA . Anthony
Highly recommend Eastside Environmental Pros for your next wetland delineation. Kellen is an experienced ecologist that will make sure all your needs are met and will take the time to walk you through the permitting process. He is friendly, professional, and easy to communicate with. Give him a call the next time you need help for all things wetland related! Thank you Eastside Environmental Pros for your help and time!!
Kellen, helped us with our critical area delineation. He was very responsive and efficient. He made the process really easy and got our project done ahead of schedule. We would definitely recommend him to anyone looking for an Ecologist!
I'm impressed by the quick turnaround of a critical areas delineation for a 5 acre plot. By far was the fastest part of the permitting process. The report was detailed and thorough. Kellen answered any questions I had along the way. Highly recommend.
Kellen is very professional and it is clear that he truly cares deeply about the impact that the work he does makes on the environment and his clients! He is my go to recommendation for any wetland consultation a person may need!
I had a great experience working with Kellen. He was very responsive and helped explain things when I didn't understand. We ended up saving money in the long run by using his service. Thank you Kellen! I will be recommending you to friends and family.
Knowledgeable and professional service! Kellen is my go to person for clients needing an Environmental Consultant in King and Snohomish County!
Top notch experience from start to finish with Kellen and his team over at Eastside Environmental. I recently purchased a piece of land with the intent of building an Airbnb Container home; the land had a small portion of wetlands on site and after searching around for firms to perform a critical area study. After searching around online I found EE and saw that they had incredible reviews and decided to proceed. Kellen not only got me the final report within 3 weeks of initial contact but kept me in the loop throughout the whole process. I cannot wait to work with Kellen again on the next site! Cannot recommend enough.
Kellen and the team at Eastside Environmental Pros are far above the rest. In the overwhelming process of purchasing land there are many questions, especially in this area. The property we are purchasing particularly had some big question marks for us regarding wetlands and streams and we knew before making a final decision we would need professional help. We also knew that beyond the purchase we would still require professional help to properly prepare the land for building and landscaping. We called several places where we simply got the voicemail of “some guy” or other places were simply far too busy to give us the time of day. We called Kellen who answered right away and assured us that his team understood the time sensitive nature/ process of making an offer on land and the feasibility phase of the purchase. He informed us that they setup their scheduling in a way that enables them to prioritize reconnaissance studies just for this reason and got us onto the schedule right away. Not only was the customer service provided top notch from the get go but Kellen really listened to our questions and ideas and carefully addressed all of them in a timely manner. This team demonstrates true partnership and we feel confident in moving forward because we have found a reliable business that can help us a long the way. Professionalism is very important and based on the experience we had in looking for a company to work with, I can say with certainty that this business operates with excellence and professionalism which is critical when taking on such a large and potentially risky project. Thanks for “having our back” Eastside Environmental Pros!!
Eastside Environmental Pros is great. Kellen at Eastside Environmental Pros walked me through the process of critical area surveying and explained me the scope of the work in a clear manner. They were responsive through all the steps and delivered what they promised. If you are looking for a professional service with a great value, look no further.
Hello Kellen, I wanted to share my gratitude for a job well done in helping me get started on the process to be able to meet Snohomish County’s requirements so that I can develop more of my property. I was overwhelmed by what they were asking for and you really took the pressure off of me in handling the critical area review and researching all of my setbacks and requirements with the county. Now I know what I need to do to move forward with my septic contractor and with the county. You were professional, responsive and accurate with your estimate of costs. I will be sure to recommend you and your company to my family, friends and church community. Thank you again- T. Andreica Snohomish, WA
Eastside Environmental Pros are exactly as the name suggests: professionals. Amazing work (and I mean amazing), up front about everything (costs, timelines, etc), and an absolute joy to work with. This is my first time needing such a service, but the quality of the work isn't lost on me. Plus, all of the contractors and other people I've needed to pass the work onto have made comments like "this is great, who did you get to do this? I'm using them next time I need an environmental study I'm using them" Also, not only is the work amazing, but customer service is clearly a priority. I can't recommend working with them more. Seriously look no further.
I am trying to think of the right words, or where to even start in this review, as my partner and I were absolutely blown away by how amazing Eastside Environmental Pros were in completing our required Wetland Study for our new home build. Previously, my partner and I purchased a lot in Seattle to build a single family home on, and after submitting for permits, we received an alert from KC that there was a stream near our home and that a Critical Areas Report needed to be completed in order to move forward with our permits. After searching all over in Seattle for an available Wetland surveyor, we contacted over 11 different ones, only 5 returned my calls, and the 4 out of those 5 said they wouldn't have our survey completed until 4 - 6 weeks, which we could not wait any longer. But, thank goodness Kellen from Eastside Environmental connected with me and presented a great offer, and said he would have it done within 10 working days, which was way better than everyone else I spoke too. After agreeing to go with Kellen, we were absolutely blown away as he actually completed our Wetland Study earlier than expected, and kept us updated every step of the way. I usually don't write a lot of reviews, but really felt the need to showcase our amazing experience with Kellen from Eastside Environmental Pros, Inc. As he was truly a pleasure to work with, and provided one of the best customer experiences we have had throughout our construction process.